Draft v1 for client review. Fields highlighted like [this] are placeholders awaiting information from the client.

Solar parks, built right and kept running.

Iliosak builds and operates utility-scale solar parks across the UK. Construction, project management and long-term operations sit with one accountable team, from the first survey to the thousandth day of generation.

Accredited and insured: [Accreditation 1] [Accreditation 2] [ISO scope] [Insurance cover]

Three services, one hand-off-free chain.

Most delays on a solar park happen between contractors. We cover the whole chain so that nothing is lost at a boundary.

Construction and EPC

From ground preparation to energisation, built to the design and the programme.

  • Access roads, drainage and civil works
  • Piling and mounting structures
  • Module and inverter installation
  • DC and AC cabling, substation and grid connection

Project management

One point of contact for design review, procurement, consents and programme, so owners see progress and cost without chasing.

  • Programme and cost control
  • Procurement and supply chain
  • Planning conditions and network operator coordination
  • Commissioning and handover documentation

Operations and maintenance

Keeping a live park generating: planned maintenance, fast fault response and clear performance reporting.

  • Preventive and corrective maintenance
  • Vegetation and site management
  • Remote monitoring and alarms
  • Monthly performance reporting

Safety and compliance are in the programme, not an appendix.

Construction at this scale means heavy plant, high voltage and live public roads. Each site is planned against UK construction regulations before anyone mobilises, and the paperwork follows the work rather than trailing it.

[SSIP / CHAS / Constructionline] [ISO 9001 / 14001 / 45001] [Incident rate figure]
  • Risk assessments and method statements for every work package
  • A construction phase plan under CDM 2015
  • Site inductions, permits to work and electrical isolation records
  • Ecology and environmental controls agreed with the planning conditions
  • A health and safety file handed over with the park

How a project runs.

Five stages, each with a clear output the owner can sign off.

  1. Brief and feasibility

    Site, grid and budget reviewed against your targets.

  2. Design and consents

    Design review, planning conditions and network offer aligned.

  3. Procurement and mobilisation

    Equipment ordered, programme fixed, site set up.

  4. Build and commission

    Construction, testing and witnessed commissioning.

  5. Energise and operate

    Handover to live operations and reporting.

Experience, in numbers.

  • [XX] MWpdelivered
  • [XX]solar parks built
  • [XX]years in solar
  • [XX]%availability under O&M

Figures to be supplied and verified by the client before launch.

Recent projects.

Case studies will appear here once the client supplies project details and permission to publish. Site plans below are illustrations, not real projects.

Illustrative site plan with fenced blocks of solar panel rows

[Project name]

[Location][XX] MWp · [Client] · [Year]
Illustrative site plan with three long blocks of panel rows

[Project name]

[Location][XX] MWp · [Client] · [Year]
Illustrative site plan with wide horizontal panel blocks

[Project name]

[Location][XX] MWp · [Client] · [Year]

Tell us about the site.

Give us the location, the size and where you are in the process. We will reply with the next step, usually a call to go through the details.

This form has no server behind it yet. Sending opens your email app with a message addressed to info@iliosak.co.uk.